Sabtu, 11 Agustus 2012

Care And Feeding Of The Ford Lehman Diesel

The time is finally growing short for our departure on our next great adventure. Since we sold our dear friend Sea Trek, our Mariner 40 ketch, we have been preparing Beach House for our Bahamas/Great Loop adventure. The first thing we did was join the AGLCA, America's Great Loop Cruisers' Association, to glean as much knowledge and information as we can from others that have done the Loop in the past or are in the process now. The number one thing we learned was that the engine and transmission would be our top priority and the most important equipment on the boat. With that in mind, we've spent many hours and dollars preparing our Ford Lehman 120 and the Paragon transmission for the 6,000 to 8,000 mile journey. If you have followed us here, you are probably well aware of the upgrades and repairs we have made. We found some minor problems when we bought the boat, added some important safety equipment we wanted, and corrected some deficiencies inherent to the engine.

From the very beginning we replaced any potential problem parts and repaired things as they broke...
I'm sure that there will be more work to be done in the engine compartment before we are ready to shove off. Items on my want-to-have list are...
  1. Heat sensor on the exhaust discharge.
  2. blowers for the engine compartment.
  3. Generator install.
  4. Finish rewiring of the house battery bank.
  5. Install one more large bilge pump.
  6. Finish painting.
We'll keep on posting as each of these projects are finished. I have just completed the installation of a Garmin GHP 10 Autopilot and that will be my next post. Except for a few hiccups, the installation was pretty straightforward. So come back and visit for the latest.

Kamis, 02 Agustus 2012

Midseason Maintenance Can Increase the Life of Your Boat

You have been told over and over that pre-season maintenance and service will ensure a trouble-free boating season. But will it really? A safe and happy boating season is a combination of preparation and prevention. It's so easy to hit the water as often as possible during the boating season and not want to spend time in the bilges or engine compartment. That's what spring commissioning is for. But a regular maintenance and service program during the season will go a long way to make the time we spend on the water truly enjoyable and safe. A little time on a regular basis will keep the breakdowns, failed equipment and need for towing to a minimum rather than a spoiled weekend while fishing or spending time with family and friends.
A routine pre-departure check should be a habit with everyone. Before leaving the dock, other than getting a weather update, take a few minutes and go through the boat's systems. Thoroughly check the engine compartment for water and fuel leaks. Look for oil dripping from lines or under the engine. Check all fluid levels including oil, water and transmission and steering fluids. Most importantly, do you have enough fuel for at least the day or to get you to a fuel dock? Check underwater seacocks to be sure they operate freely and that all hoses are secured with adequate clamps. Check to be sure all sea water strainers are clean and no clogs are present. Are the batteries fully charged for both running equipment and starting the engine, and are the batteries topped off with water if wet cells? You'll also want to be sure your electronics and navigation lights are working properly and your charts are all up to date. Is all safety equipment on board, current and in good working order? These are just a few items to check and make corrections to anything that might affect the safety and operation of the boat. (See our pre-departure check list.)

Your engines and generators are the most expensive and most used pieces of equipment on the boat. Even if your preference is for sail, the engine gets you in and out of the slip and back home quickly should the weather turn nasty. Check all of your manuals for all mechanical equipment on board and follow the recommended service schedules. A proper oil and filter change was probably done during the Spring or Winter commissioning, but if you like to use the boat a lot, chances are another service will be needed during the season. Base the need to change them on your engine hour maintenance schedule rather than the time of year. Keeping the oil and filters clean will go a long way to prolonging the life of any engine. Add engine coolant as needed and never let the coolant levels fall too low. Keep a close eye on fuel filters. Change them frequently if there is any possibility that you may have taken on dirty fuel or that water may have mixed with the fuel, especially if your fuel tanks have not been cleaned for a long time. A minimum of 100 hours between filter changes is a good rule of thumb, but sooner is better than later if in doubt. For gasoline engines, a midseason tune-up will save money on fuel and keep things running just the way you want them to. If your primary boat or your dinghy has an outboard, change the oil in the lower unit at about mid-season or based on the engines hours according to the engine manual. Check and adjust any engine belts. Be careful not to over tighten, and if you are not sure what the tension should be, check with a local mechanic or your engine manufacturer.

The head is an area that we would like to just have work well and not ever deal with, but the last thing you need is to have it fail in the middle of the day with a boat load of folks on board. Be sure the holding tank is pumped frequently and all valves and pumps are lubricated and working. Look for obvious leaks around hoses and the pumping mechanism. Correct these leaks immediately since they will only get worse and are an indicator of more potentially serious problems. Be sure everyone aboard understands to do's and don'ts of a marine toilet.

Don't neglect the boats exterior during the season and it will pay off with big dividends in the long run. Give the boat a thorough wash down after every use, especially in salt water, and use a soap formulated for boats to prolong the wax that was applied in the spring and to protect painted surfaces. Dish soap and other types will strip off wax and can damage painted surfaces if used for prolong periods. An additional coat of wax midseason is also a good idea if the boat is used frequently. Any exterior teak should get a maintenance coat of varnish or teal oil to keep it protected from UV or water damage. Windows and hatches should be cleaned and protected with a coating designed for glass or plastic depending on the material. Look for abrasions or scratches in the hull or gelcoat and repair them as soon as possible. If you happen to be snorkeling near your favorite beach, take a few minutes and have a look at the hull underwater. Change zincs if necessary and give the hull a scrub to remove any growth or barnacles. Check both rudders and props for damage or lines that might have become entangled. If the prop is damaged, have it removed and repaired. If you don't have dive equipment or if snorkeling won't get the job done, hire a professional diver to take care of any needed bottom maintenance. A clean bottom is much more fuel efficient and with the cost of fuel today, every savings helps.  

Other general maintenance should include checking steering cables or hydraulic connections, all fuel tanks are secure, engine room blowers are operational and the bilges are clean and free of oil and debris. It's difficult to list everything for every type of boat in this short article, so a wise Captain will develop his own maintenance schedule and keep a record of what was done when. We keep a Maintenance Log of every item, both major and minor, that gets done on the boat. It's easy to go back and see what you have done and what will need to be done before the next outing. I know how hard it is to take time away from enjoying the boat and getting down in the bilge for a cleaning or an oil change instead of spending the day on your favorite waterway. But the payoff is much larger than the inconvenience and in the end will truly ensure a happy boating season. Proper maintenance will extend the life of your boat and equipment, save you money in the long run, make the boating season a safe and enjoyable time and shorten the work list for your winter de-commissioning. Enjoy the summer!

Chuck's Pre-Departure Check List
  • Float Plan Filed
  • Weather Forecast
  • Engine Oil
  • Generator Oil
  • Engine Coolant
  • Generator Coolant
  • Steering Fluids
  • Battery Water
  • Battery Condition House Banks
  • Battery Condition Start Battery
  • Transmission Fluid
  • Engine Hours
  • Fuel Level
  • Water Tank Level
  • Holding Tank Level
  • Bilge Dry
  • Bilge Pumps
  • Seacocks/Strainers
  • Radio
  • Electronics
  • Navigation Lights
  • Sound Producing Device (Horn)
  • Vessel Registration/Documentation
  • Proper PFD's and Safety Equipment
  • Current Charts
  • First Aid Kit / Needed Medications
  • Sun Screen
  • Crew and Passenger Safety Briefing
  • Head Working
  • Steering / Throttle / Shifter

 Each Skipper will have their own items specific to their needs and type of boat. The important thing is to build your list and USE IT.

Kamis, 19 Juli 2012

From A Fabric Bimini To A Hardtop In One Day

As many of our followers know, we built our own bimini back in June of 2009. The yellow Sunbrella has kind of been a trademark for Beach House wherever we go. But the Florida sunshine and the cold damp weather in the Chesapeake has taken a toll in just a few short years. We usually get at least five years out of a bimini, but not this time. Weighing the pros and cons of building another fabric bimini or finding an alternative has suddenly come to the top of the to-do list. This is another of those unexpected repairs that we thought we would deal with in another couple of years. But it is a boat after all.



It wasn't so much that the fabric has deteriorated, it is a bit thin, but more about the staining that has appeared. At first we thought it was mold or mildew, but the stains were not the usual dark color of mildew. Instead they were a very bright shade of green. No amount of soap or cleaners would remove it and it was getting worse as time went by. The heavy spring pollen is a possible suspect, especially since it seems that the stains collect and soak to the underside with each rain. We loved our hardtop on our sailboat, Sea Trek, and seriously considered a hardtop for the flybridge. A major concern was the added weight a fiberglass top would present that high off of the deck. After some research and getting some feedback, we started looking at a product from Hard-To-Top in Michigan. The hardtop panels are a lightweight but strong polycarbonate and the frame is anodized aluminum, making it strong but not heavy. From the very beginning, Al Miller, Owner, and his crew were extremely helpful through the entire process.



 
The first step is to go online at the Hard-To-Top website and download a measuring sheet. Follow the instructions and measure carefully according to the directions. Once the measuring sheet is completed, go to the Contact Us page on the website and request a quote. We were very surprised to find the quote was not far from what it would cost to have someone build us a fabric bimini.



 
Once we were satisfied with the cost, Chris from Hard-To-Top emailed us a layout of the top for final approval. We made a couple of minor adjustments because of the irregular shape of our bimini frame and that was it. The Hard-To-Top unit attaches directly to our existing bimini frame, a feature we very much liked. Our last hardtop required us to have a separate aluminum frame built, which can be expensive. In short order, we received an email that the top was on its way. The shipping carton is very large because of the size of our top so it had to be shipped on a truck rather than UPS or FedEx. Once it arrived, we excitedly unpacked everything and began to lay out our plan for installation. The installation instructions can be downloaded in advance from the Hard-To-Top website.




All of the hardware and parts are neatly packaged for our particular installation requirements. The only tools we needed were an electric drill, tape measure, screwdriver, a 10-24 drill bit and tap, a 1/4-inch drill bit, some adjustable clamps, a ratchet and socket to install the stainless clamps and a hex wrench. We also used a piece of line (more later) to hold the panels in place so the breeze wouldn't send them flying. Susan and I estimated that we could easily complete the installation in one day, if the weather would allow it.




The polycarbonate panels come partially assembled with the aluminum channels (called E-8 in the instructions) attached on each side. The panels also have a protective plastic covering that needs to be removed before the panels are in place. The protective covering should not be left on the panels in the sun, for any period of time, or it may be difficult to remove.




Our installation required one panel to be centered on the bimini frame. Leaving the protective plastic on the underside of the panel in place, we marked the panel at the center on both ends very near to where they would sit on the front and back bimini frame. This would not mark up the finished panels. We did remove the protective plastic on the top of the panel.





Our next step was to level all of the bows - we have five - of the bimini frame to carefully mark the center of the front and back bows. We tied a piece of string tightly to the front and rear bows and used the string to align and level the others.




Once we were satisfied that everything was marked for center and as level as possible, we checked it all again just to be sure.




Susan and I easily slid the first panel in place and lined up our center marks. The panels come pre-marked, center, port 1, port 2, etc. To find the center of the bows we used a piece of flat stock taped to the bows, marked the center and used a carpenters square to find the center of the bow. This gave us the best measurement, since this is critical to getting everything straight and square with the bimini frame. Once the first panel was in place, we slid the next panel over the bows and lined it up, keeping everything centered.




The day was turning a little breezy at this point and since our top was 8 feet wide and 10 feet long, the breeze wanted to blow the panels away. That's where our adjustable clamps and piece of line came in handy. We used the adjustable clamps to gently hold one side of the center panel in place. The piece of line was used to keep the adjoining panel just snug enough so that we could start installing the stainless clamps that would hold everything in place. Before installing the adjoining panel, we applied a thin bead of the supplied caulk to entire length of the inside corner of the aluminum (E-8) extrusions.




With the hole in the supplied stainless steel clamps in the exact location on the bow where they will be installed, we used a felt tip marker to mark the location of the hole we would drill for the fasteners. It's very important that the flange on the top side of the panel is pointing toward the outside edge of the top. It is also very important that the 1/4-inch hole is drilled through that flange, to hold it all together. 



 
 
We also made sure that everything, including the polycarbonate sheets, were tight together. The hole needs to go through the aluminum and polycarbonate. The SS clamps were installed on the front and back bows and the center panel first. Once each end was clamped, we installed them on all of the other bows.




For us, probably the hardest part of the entire installation was getting the fastener nuts on the stainless clamps. We found a little assist from a pair of channel locks made the process a bit easier. The fasteners have a hex head on the bolt and a locking nut to keep them from coming loose. Once the fastener was started, we used a ratchet to tighten everything down. We were careful not to overtighten and crush the aluminum (E-8) extrusions.




We completed one side of the first center panel, and with all of those bows clamped, installed the next adjoining section. Once we had two lengths of the E-8 extrusions clamped, we were a little more comfortable with the breeze picking up. We still used the adjustable clamps to hold down the end panels until we had the front and rear stainless clamps installed.




We repeated all of these steps working out from the center to the edges of the frame. As each panel was completely installed, the top was looking better and better and we were feeling good about our decision. We were surprised at the ease that everything was going into place and at how quickly the entire process was going. We had allotted ourselves the entire weekend for the project but it was obvious it was only going to take us a day.




Any time I am installing stainless steel fasteners into aluminum, I coat the threads of the fasteners with a product called Tef-Gel. There are other similar products, but I much prefer the Tef-Gel and have been using it for years. In a boating environment, corrosion between stainless fasteners and aluminum can happen very quickly and eventually weld the fastener to the aluminum, making removal almost impossible and includes the potential for failure. The Tef-Gel inserts itself as a barrier to prevent the corrosion and makes removal easy. All of the fasteners in the hardtop received this treatment.




On the outside panels we found it easier to remove the extrusions (E-8) from the panels and install the clamps, then slide the panels back in place. The Hard-To-Top is designed with an overhang, and trying to install the SS clamps hanging out over the edge was a bit much. By removing the panel, it made this part easier and faster. The fasteners don't go through the polycarbonate panel on the outside pieces. 




Through the entire process, we used our rope clamp to keep the panels snug together being careful not to overtighten it. Our top required the center panel, two adjoining panels and two smaller outside panels. The two small outside panels were installed last.




We removed the protective plastic covering on the underside before we put the panel in place and installed the stainless clamps. The topside covering was removed as soon as each panel was installed. This kept us from scratching the surface as we slid new sections in place.




The smaller outside panels were put in place. These panels were tapered to allow for the shape of the top being wider in the back than the front, and the corners are rounded to fit the final frame.




With all of the panels in place and securely fastened, it was time for the outside frame to be installed.





The frame consists of four corner pieces - two bowed sections for the front and back and the side extrusions. 





The 90-degree corners have pre-drilled and tapped threads on two ends to allow the front and rear bows (HTE-1) to be slid into the corners and held in place for an exact fit. The two corners attached to the arched ends are put in place and can be adjusted if needed. The crew at Hard-To-Top did such a great job that the fit was perfect. We installed the back end first and with that section in place, slid the side sections (HTE-2) into the two corners. This part is where an extra set of hands really helps. Doing the install in the slip makes you very conscious that one misstep means a part going overboard.




The side extrusions (HTE-2) on our top are about 9 feet long. The only real adjustments we had to do were to be sure that the flat portion of the ends and side were 90 degrees to the polycarbonate panels. Loosening the set screws in the corners and a slight twist assures that everything is in the proper position.




The final step is to remove the set screws one at a time and drill and tap for the 10-24 screws. Then reinstall the screws using the Tef-Gel on the threads. Alignment is important to be sure that the hole drilled and tapped will go into the side and end extrusions. We did this for all of the screws on each end of the 90 degree corners.





Once everything has been drilled, tapped and secured, the hardtop was looking great and we were feeling good about how it looked. The strength of the structure is pretty impressive as well.




Our finished top will have a 3-inch overhang all around. The sides will actually overhang the entire width of the flybridge by 3 inches to allow water to off.




With everything in place to this point, we could take a break and stand back to admire our handy work. The top fit exactly as we expected and planned. We were almost finished, but there was one more small step before completion.




There is a small L bracket called a "3/4 cap" that needs to be attached to the E-8 channels and the end bows (HTE-1). The bracket is attached to the front and back end of each E-8 channels and the bottom edge of the front and back bow by marking them in place. 




Next, the marks need to be drilled and tapping for a 10-24 fasteners and screwed in place. This adds more security to help keep everything together in adverse weather conditions. 




Once these last pieces of the puzzle are put in place, the installation is complete. It's amazing how simple and easy the entire process went.




Needless to say, we were carefully watched by several folks in the marina as the day progressed. Everyone was impressed at how quickly we finished the project and more impressed with the finished results. We fully expect the hardtop to last for many more years than any fabric cover would have, and in the long run actually save us money by not having the constant replacement costs. We also like the ease of maintenance, only have to do a wash down when we do the rest of the boat. One concern was the inability to remove the top in storm conditions. After we finished the installation, we now feel that as long as the original bimini frame is well-secured, the top will not be an issue. We especially like the way the top will provide shade but still allow light through. For anyone considering a replacement for a fabric bimini, we highly recommend you look at Hard-To-Top. We're not sure yet whether we will add side curtains in the future or just leave the flybridge open.

Senin, 18 Juni 2012

A Bit Overwhelmed

I really haven't had to interview for many jobs. Most of the time I either knew the company and owner well or they knew me and approached me for a position. But the few times I have had an interview, one of the questions almost always asked was "what did I consider one of my major weaknesses." Right now that weakness has reared it's ugly head big time and I am feeling the effects. I never have to hesitate to answer the question because I know the answer all too well. I have always had a tendency to try and do too much at one time and start another project before I finished the previous one. After this weekend, that weakness has taken on a whole new meaning.



Where do I start? I have finally ordered our new autopilot and decided on the Garmin GHP-10 after doing lots of research. I found the best price for the Core Pack at the GPS Store. But their price for the 2.0L pump was higher than I found it at Anchor Express and The GPS Store didn't seem interested in price matching. All of the parts arrived promptly, so I immediately began to plan the layout and started mounting some of the system.




In the meantime, a friend in the marina had offered to help me lower the mast so I could work on the wiring and, more importantly, give it a good paint job. We took it down about the same time as the autopilot arrived. I was in the process of removing all of the hardware and rigging, and re-running the TV coax and wiring for the spreader lights. The mast needed a good sanding and priming before the paint could go on.





Our transmission has been on the list of things that must be done for quite some time. A leak in a seal or gasket has been a bother almost since we bought the boat. We've tolerated it to this point because the leak has been slight and a drip pad under the transmission has been sufficient. We do check the fluids regularly and top off as needed, but this had to be fixed before our next long trip. Well, wouldn't you know it. The planets aligned and the universe said, it's time. Our mechanic could get us on his schedule, the transmission shop wasn't busy and could get to it right away, and we had no plans to go anywhere soon. Besides, hurricane season has started in south Florida and we want the boat ready to move if we need to. So out came the transmission and while it's out, I want to replace the engine mounts, clean up, and paint around the compartment and engine parts while everything is open.

Ahhhh, but we're not done yet. I have been negotiating with the folks at Hard To Top for a replacement hardtop for our flybridge. The canvas bimini was not looking very good and we much prefer a hardtop to canvas. Our sailboat had a hardtop that we built ourselves and we really, really liked it. We finally agreed on a price and it was fabricated and shipped to us a couple of days ago. So Susan and I removed the canvas bimini and began installing the hardtop.

So that's where we are today and why I feel a bit overwhelmed at the moment. I have to stop and prioritize each project if I plan to get them all done in a reasonable time. I do work on each for a couple of hours each day. The mast has been painted and I am in the process of re-installing all of the hardware. It should go back up in a few days and that project will be done. The rest will be much further along by the end of the week. I need to start on relocating the house battery bank so there will be room for the generator, which is another install. But I've promised myself that I will not start anything else until all of these projects are completed. Yep, I promised myself.

Oh, and we just changed Satellite TV providers and the new satellite dish is larger, so I had to reinforce the Track-It system to handle the larger dish. A minor additional distraction. As we get these all completed we will post the details, so stay tuned.

Sabtu, 09 Juni 2012

WiFi on the Boat - Part 3

It has been a while since we have posted any additional information on our highly successful WiFi set up on the boat. To really see how we have arrived at this point, you need to go back and read our previous posts starting with Part 1 and then  Part 2. Our original WiFi set up worked great right up until the day we took it down and switched over to this new system. We have been using this for some time now, but I am just getting around to posting the how to and our results to date. The reason for the change was nothing more than seeing what was new and trying out this system because we have had a lot of positive feedback from other boaters. Our experience has been very positive although not quite the "wow" we expected.



For the last few years, we have heard a lot of chatter about the newer Ubiquiti Bullet that cruisers and boaters have been raving about. From Mexico to the Bahamas to New England, everyone has been posting excellent WiFi access with the Bullet so we just had to see what all the fuss was about. It was a difficult decision because our Engenius adapter was still providing us with all of the access we needed and one of my top rules is, "if it ain't broke, don't fix it." But curiosity finally got the best of me and we purchased the Bullet M2 HP. A big plus was that the antenna for our original set up would work on the Bullet, so this part did not have to be replaced. Any money saved is always a good thing. The Bullet screws directly on to the antenna so no cable connection is required. The mounting components that we changed early on and have been using for years works great with the new hardware.



The Bullet fit perfectly in the PVC pipe mounting we have been using. This mount helps to overcome one of the problems with the Bullet - having it outside in the weather. It provides a waterproof housing that will keep moisture intrusion out of the cable. Unlike the Engenius adapter, the Bullet is attached via a Cat5 cable instead of an active USB. In this photo, we test fitted the Bullet and antenna to the cap to be sure the hole size did not have to be changed.




Once it was clear that everything would fit, a bit of sealant around the hole where the antenna passes through, and around the cap and bottom, made everything perfectly water tight. With the Cat5 cable, there is no restriction as to the length, so we carefully measured how much was needed to run from the mount, through the boat and to the computer. The computer is in our forward cabin where we have set up our "office." We do have another computer at the helm station and we want to be able to access that with WiFi also. A little more about that later.




The mounting looks clean and unobtrusive. In this location, it has done well for us, but on other boats, another location might work better. We have found that the higher up it is mounted, the better reception for the access stations. I also recommend that outdoor Cat5 cable be used or at least cover the cable to provide additional UV protection. Our cable runs down the bimini frame, into a vent near the bottom of the outside of the flybridge, down a wire run to the lower helm station and then into the forward cabin, starboard side.



The hardware installation is not quite done yet. Unlike the Engenius, the Bullet gets its power through a POE (power over ethernet) device. Be sure it is a 12-volt device since they can be purchased in various voltages. There are many sources for a 12-volt POE, including Pasadena Networks where we purchased our Bullet. The POE can be either 12-volt powered and wired directly to the boat's DC system or 120-volt powered, which means it will run off of the shore power, generator or inverter. The installation is simple. The incoming Cat5 goes into the input side and another Ethernet cable comes from the outlet to the computer, or as we did, a separate router.




Since we have multiple computers, we want to be able to access the WiFi on either computer and not have to plug and unplug them. We also want to be able to use the computers anywhere on the boat and not be restricted to the forward cabin. We chose the Cradlepoint Router, once again because of positive feedback from users. It isn't one of the least expensive routers, but we have found it to be of excellent quality. Our choice is the MBR 900 and it turned out to be a good choice for us.



Now here's where it gets tricky. Our Engenius was pretty much plug and play. If you are at all intimidated by setting up computer hardware, you might consider a couple of choices. These systems can be purchased, for a great deal more money, already put together and set up to run when you get them. Or you can use a system like our Engenius that is very simple to set up. There is a fair amount of extra effort to get the Bullet set up and running and even more to to add the router to the system.

If you still want to go for it, the next step is to set up the Bullet. An excellent how to can be found here and here. Although the second link is for a Nanostation, it works for the Bullet. The Cat5 cable needs to be connected from the Bullet to the POE and then directly to the ethernet connection on your computer. The POE must have power, either from your DC or AC system, in order to do any set up. Once you have followed all of the instructions for the Bullet set up and confirmed that it is working, the Router needs to be set up to work with the Bullet.




Rather than make this a very, very long posting, I will refer you to a good set up how to for the CradlePoint router. If you had no problem setting up the Bullet, you won't have a problem setting up the router. These instructions are specifically for the CradlePoint, so if you are using another brand, you are on your own. Once the router is set up, the Cat5 cable from the POE is connected to the input for the router. You computer is then set up to connect via WiFi directly from your router. Be sure and enable your security for the router and choose a very difficult password so no one else can log in to your network. And that's it. Hopefully all went well and you are blogging like mad.


And now for our review. We've been using this system for about two years now. We find it to be an improvement over the Engenius system, BUT not a major improvement. If we had to stay with our original set up, I wouldn't have the slightest problem with that. We do seem to pick up a few more access points ON OCCASION than we did with the previous system. But most of them are secure access points so we don't really have more connections. We have received signals from access points at two miles away or more with the Engenius and don't seem to do better with the Bullet. Perhaps once we are cruising in locations where we have not been before and where there are weaker signals to work with, the improvements might show up better. In the end, time will tell. For now it works fine and we have the old system as a back up should we have a failure. I feel very comfortable and confident with both systems. Whether you should upgrade is a decision you will have to make. If your current system is not living up to your expectations, then by all means upgrade. If you are starting from scratch, I highly recommend that you go with the Bullet. Good luck and stay safe.


And be sure to read our post on securing your WiFi connections.